Online Sanction of Building Plan - List of Documents required
Approved site plan of the land.
A plan showing elevation and sections of the proposed building together with a specification of the work (in case of a building under the Salt Lake Township under Bidhannagar Municipality or Nabadiganta Industrial Township Authority the provisions of rule 96(a) has to be followed).
1) Plan showing elevation & section together with a specification of the work in AutoCAD.
2) Plan duly signed by owner and all technical personnel showing elevation & section.
Engagement Certificate of all technical personnel to be engaged as per relevant portion as prescribed in Form B.
Geo technical Investigation report (in pdf format).
Detailed Structural drawings (in AutoCad software) ( Please refer Rule 53 / Rule 155).
Duly signed Form B.
Water supply and sewage disposal plans.
Copy of the possession certificate .
Sewage and water connection plan as per rule 96(b).
Reports of soil test or test for stability of slope as per rule 157 (If Applicable).
Detailed calculation of structural design as per provision in these rules.
1) STAAD input file.
2) Output file of STAAD analysis.
3) Input and Output etab file.
4) Duly signed copies of the drawings (Structural, Architectural), design calculations.
Current paid up Municipal Tax receipt.
Clearance certificate/application copy from U.L.C. Branch of Urban Development Department, Government of West Bengal (if applicable).
No objection of West Bengal Fire and Emergency Services Dept. (if applicable).
No objection certificate from the Director of Factories or Industries, Government of West Bengal.
No objection certificate from the West Bengal Pollution Control Board / Department of Environment, Government of West Bengal.
No objection certificate from the West Bengal State Electricity Distribution Company Limited / Calcutta Electricity Supply Corporation.
No objection certificate from the Public Health Engineering Directorate, Government of West Bengal.
Indemnity Bond (As per form No. L).
Copy of Deed and Deed plan.
Registered Undertaking for common passage (if applicable).
Power of Attorney (if applicable).
Sanctioned plan in case of any existing structure.
FAR Calculation Sheet (if applicable).
Certificate of empanelment of LBS, as per rule.
Certificate of empanelment of Geo-technical engineer, as per rule.
Certificate of empanelment of Structural engineer as per rule.
Certificate of empanelment of Structural Reviewer from MED/KMC, as per rule.
Certificate from Council of Architect (if Architect engaged).
Unit Details.
 
 
 
 
 
 